LACONIA

1 PV park with a total nominal power of 2MW
MORE
01/06

Laconia

Laconia’s P/V Park with a total nominal power of 2MW is located near the village of Elos southeast from the city of Sparta at approximately 250 kilometers distance from the city of Athens. 

 

  1. The Park was constructed during 2011 and was put in operation on 2012.
  2. The total Nominal Power is at 2 MW.
  3. The annual electricity the park produces is estimated to be 1.600 kWh/kWp.