Thebes
The cluster of the parks in Thebes with a total installed capacity of 2,9 MW consists of four solar parks. The kilometer distance of the parks is estimated at about 80 km from the city of Athens.
- The parks were constructed during 2012 and began operating in December of 2012.
- The installed capacity of the four parks is 2MW, 0.5MW, 0.3MW and 0.1MW respectively.
- The total annual electricity that the parks produce is estimated to be 1.450 kWh/kWp.